Woodpace of house -building plants
The unification into a single team of production workers, transporters, installers, finishers, designers, technologists stimulates acceleration of construction at all stages and increases their general interest and responsibility in the final result of work – delivery of a house, completely completed, ready for operation, of good quality.
The staff of the plant is interested in the project to be as rational as possible, so that the sizes and configuration of elements contribute to the improvement of the technology of their production and installation, so that the manufactured structures have high quality and full technical readiness and contribute to facilitating installation, etc. D.
All conditions are created for more rational planning and development of urban territories, for the effective use of standard projects, reducing the volume of work on engineering training and for the preliminary high -quality implementation of these works.
Among the many advantages of the new home -building method are still special. The transfer of a larger volume of construction operations to factory conditions significantly improves the working conditions of workers. Most of them now work in bright, mechanized workshops, use landscaped household premises and t. D. The work of the installers is much easier. The overall culture of construction production is noticeably increased, staff turnover is reduced. Get a loan at the Sberbank department in St. Petersburg No. 05590550730
The creation of the house -building plant itself costs much cheaper than the construction of a set of enterprises that provide housing construction projects in the same volume with the necessary products.
The experience of the plants operating in St. Petersburg has confirmed the positive aspects of the new progressive method of homebuilding. The unification in one plant of disparate production and construction processes and the transformation of construction into a continuous technological process in one plant. The rationality of the accepted structural scheme was also revealed, in which the plant, now subordinate not to the trust, but the head, is a subcontractor in relation to a generally maintenance trust.