The neighboring rows of columns were mounted sequentially. They were installed on the fixers and were attached through special clamps with horizontal struts in the direction of the longitudinal axes of the building and braces in the transverse direction. The length of the spacers and braces was regulated.
Districts were introduced and installed to the fixers of the heads of the verified columns. The conical shape of the fixers and bevels in the nests facilitated the guidance of the elements and allowed to install them in the design position without additional reconciliation with the tolerances determined in advance. Installation ties of the runs with columns through the fixers were quite reliable and allowed the welding of installation conjugation of the frame after the end of the assembly of the elements of the entire capture. For welding, light stairs with sites were used, and for the extreme rows – cradles hung on columns.
After the welding of the nodes on the capture, the brackets located along the transverse axes were removed on the capture. Then, stiffness diaphragms, stairwell panels, partitions, staircases and platforms were installed. For the facting of the partitions under the Ragels of the frames, the device was used, mounted on the portable ladder of the installer. After serving the materials and products necessary for subsequent post -ont work, the floor panels were collected, for the installation of which a six -Soviet balancer sling was used. The panels of the ceilings and nodes of the frame are frozen. Ceramic tiles that can be found here are useful in the house.
Following the installation of the floor panels, wall panels were installed and the frame of the next floor was assembled.
According to the project, wall panels were attached to the frame using welding. Such a mount entailed the device in the panels of special nests and significant inconvenience during installation.